The parts of the project that Fax Lists takes responsibility for and the work done are; Caisson Works: The caisson fabrication works, which started in February 2018, were completed in May 2019 with two caissons, one of which is 82.3 meters, 71.4 meters and 16 meters in length, width and height, and the other is 82.3 meters, 71.4 meters Fax Lists 21 meters, with a mold area of 77 thousand square meters. also completed. In caisson works Fax Lists where occupational safety, timing and conformity of production are of great importance, the operation.
Was carried out easily and safely with the 150 F climbing Fax Lists system, and a safe working area was provided in all working areas with Dokascaff Uni working scaffolding systems. Doka systems used in the project: MF240 Climbing System, Top 50 large surface formwork system solution, 150 F Climbing System, DokaScaff Uni scaffold Fax Lists work platforms and stair towers, Heavy load carrying scaffolding D2 Anchor Blocks: Construction of Anchor Blocks, which started in November 2018, with 147,750 cubic meters of concrete, 18,400 tons Fax Lists of iron reinforcement and 27,200 square meters of formwork area, was completed in November 2019.
In this part of the project, where the Fax Lists construction method, materials used and timing are very important as it is one of the other important elements of the building, Doka managed to provide a fast and reliable solution despite the difficult design of the building. Doka systems used in the project: Frami Xlife Column and Curtain System, Top 50 large surface formwork system solution, 150F Climbing System, Heavy load Fax Lists carrying scaffolding D2, DokaScaff Uni scaffolding work platforms and stair towers. Approach viaducts: The approach viaducts, which are bridges built with the Push-Slide method, have two Fax Lists separate bridge formworks with 38-meter formwork dimensions and a total area of 3,500 square meters.